✓Highly competitive prices ✓UK-wide delivery ✓Manufacturer-direct ductwork ✓Real technical support

Advice & Installation Guides

Practical technical guidance

Advice and installation guides

Clear guidance to help you select compatible products, prepare the job and avoid common ductwork and fan installation mistakes.

Start with the job in front of you

Popular guidance

Choose a focused guide or use the links to find the products and technical support that match your project.

Ductwork

Ductwork and fittings

Choose compatible tube, bends, reducers, branches, collars and the accessories needed to complete the run.

Browse duct fittings →

Life safety

Fire and smoke ductwork

Understand the system route, tested construction and why installation must follow the approved specification.

Read fire and smoke guidance →

Air distribution

Grilles, diffusers and plenums

Match the air terminal, neck size, plenum entry arrangement and spigot diameter to the application.

Browse air-distribution products →

Model matching

AC and FCU plenums

Search by indoor-unit manufacturer and model, then configure the connection arrangement required.

Find an AC or FCU plenum →

Before installation

Five checks that prevent most avoidable problems

These points do not replace the manufacturer’s instructions or the project specification, but they provide a useful final check before work begins.

Safety first: electrical work, fire and smoke systems, structural supports and regulated installations must be completed by suitably qualified people.

Confirm sizes and compatibility

Check every connection size, male or female end, flange type, voltage, phase and controller compatibility before installation.

Plan supports and service access

Support ductwork and equipment independently where required, avoid loading fan casings and leave practical access for inspection and maintenance.

Protect airflow

Avoid abrupt restrictions, damaged flexible duct and poorly positioned bends. Straight, well-supported connections help equipment perform as intended.

Seal and finish the system

Use the specified gaskets, sealants, tapes and fixings. Clean mating surfaces and complete joints consistently along the full system.

Inspect before commissioning

Confirm the installation is clean and secure, protective materials have been removed, controls are correctly connected and access panels remain reachable.

Still unsure?

Ask the DuctFix technical team

Send the product reference, dimensions, model number, drawings or photographs you have. We can help identify the right product or the information still needed.

Get technical help

Reviewed by the DuctFix technical team · Updated October 2026. Always follow the current manufacturer’s instructions and the project specification.

Shopping Basket
Scroll to Top